LLC "MS Cargo" Transport and Logistics Company Kyiv

Capacity: 600 kW
Solar modules: 1090 (Canadian Solar Mono 550 W)
Inverter: 5 (Huawei)
Project payback period: 3 years

The first phase of the solar power station was built during the construction of the logistics center. The work took place in winter, so the conditions were challenging: cold, snow. A distinctive feature of the project is the roof with soft mineral wool, which required the use of special plates under the ballast to distribute the load over a larger area and prevent the roof from sagging. The plan is to expand the station, allowing for the efficient use of the available space.